Wheatstone Liquefied Natural Gas project in Onslow, Western Australia
Wheatstone Project consists of LNG liquefaction and export plant will have an annual capacity of 15 million tonnes of LNG. In the first stage, the plant will have a gas plant, and two LNG trains with a capacity of 4.3 million tonnes per year each. Project value is A$29 billion. The Project brings together a joint venture between Chevron Australia Pty (72%) Royal Dutch Shell (6.4%) Apache Julimar Pty Ltd (13%), KUFPEC Australia (7%) and Kyushu Electric Power Co. (1.6%).
Bosnafix scope of work consists of the following:
- Installation of all reinforcement on concrete structures associated with Materials Offloading Facility (MOF), reinforcement beams etc.
- Total reinforcement tonnage 1000T.
- Workforce will peak at 1 Supervisor and 10 steelfixers.
Project Dates: September 2013 until February 2014
Client: Thiess & Belgian company BESIX SA (BEST JV)
EPCM: Bechtel
Owner: Chevron